INSTALL INSTRUCTION FOR LCN PULL ARM

RELATED FAQS

Question
Answer
When installing the arm; the gearbox shaft and door must be at the (+90°) full open position. The following step are used to install the Senior Swing (STD) pull arm. Install the header using app...
The hold open position on a "REG" or "EDA"  hold open arm is set with the door to a few degrees shy of the desired hold open point. To properly set, open the door 5° less then the desired hold open...
When installing the arm; the gearbox shaft  and door must be at the (+90°) full open position. The following step are used to install the Sr. Swing (REG) push arm. Install the header and door brac...
EDA ARM - The EDA arm is a heavy duty parallel arm mount.  The degree of door opening is determined by the template used for mounting. EDA arm closers can only be mounted as a Push Side parallel ar...
The Senior Swing operator is designed to power open the door to 90°. The built in dead stop (in the gearbox) prevents it from opening any further. If the Senior Swing operator is opening to far (pa...
Pull Side Mount: The 4040SEL X ST-2966 is required for pull side mounting with swing clear hinges. ST-2966 template
Push Side Mount: Take the dimensions for the closer and track from centerline of swing clear hinge pin for the push side mount.
The maximum opening is 120° with the 4041/4041XP standard templating on the pull side of the door.
 The correct method (process) for setting the hold open is: The 4010 hold open arms are handed, verify correct hand arm. (R or L stamped on main arm) Loosen the hold open nut. Opened the door ...