installation instructionsfor pocked door frame

RELATED FAQS

Question
Answer
It is always recommended to point installers to the industry installation manuals which are very comprehensive and are ANSI documents. SDI (Steel Door Institute) installation manual can be found...
For both DW and K-Series Drywall Slip-on frames, Steelcraft locates the compression anchor in the jamb soffits approximately 4" down from the head on each jamb. Regardless of door opening height: ...
Industry standards for hollow metal frames installation tolerances have been developed by both the SDI (Steel Door Institute) and HMMA (Hollow Metal Manufacturers). Both standards are based on the ...
Yes, as an option, Steelcraft doors are available with factory prepared for the 98/9949 Concealed Vertical Cable Exit Device. L, B, CE, T and CE-Series doors are available factory prepared Door...
CAUTION must be used in investigating this problem - In most cases, excessive field rusting of products is caused by improper storage at the jobsite. That situation must be validated prior to refus...
Lead lined frames are intended for use in the X-ray Room locations in Health Care facilities. Frames are provided by Steelcraft prepped as follows:  Frames are supplied knock-down (KD). Fram...
Steelcraft offers two optional types of reinforcements for open section header to be installed in distributor shop or in the field: Full profile sleeve; is a 14 gauge, 16" long part to fit the p...
The rough opening dimensions are the same for either Welded (SUA) or Knock Down (KD) frames For F, FN, FE, DE, MU three sided frames and four sided borrowed light frames: New masonry Walls: N...
 For DW, K three sided frames and four sided borrowed light frames: Three sided frame = door opening width (order size) plus 1 1/2" minimum to 2" maximum and the door opening height ...