LCN Astro Swing instructions

RELATED FAQS

Question
Answer
When installing the arm; the gearbox shaft and door must be at the (+90°) full open position. The following step are used to install the Senior Swing (STD) pull arm. Install the header using app...
When installing the arm; the gearbox shaft  and door must be at the (+90°) full open position. The following step are used to install the Sr. Swing (REG) push arm. Install the header and door brac...
The Mid Swing was discontinued Sept. of 2009. The Sr. Swing control box has the power boost feature which the Mid Swing control box did not have. If you replace only the Mid Swing control box with...
LCN does not does not have or supply any information for the old (obsolete) "High Energy" Dor-O-Matic Sliding doors, Bi-Fold doors or Astro Swing doors. You MUST be AAADM certified to work on, or g...
The 4000T Series closers have a maximum opening of 90°.
Here is an updated list of errors shown on keypad display of the Senior Swing control: Er04 - Voltage Monitor was high during Opening hardware check. Er05 - Master or slave CPU has oscillator ...
An electric strike or maglock (24 volt only) can be wired to a Senior Swing 2800/9500 series operator using the P10 Lock Interface cable. To power the 24VDC electric strike or maglock off a LCN Se...