senior swing (std) arm installation

RELATED FAQS

Question
Answer
When installing the arm; the gearbox shaft and door must be at the (+90°) full open position. The following step are used to install the Senior Swing (STD) pull arm. Install the header using app...
When installing the arm; the gearbox shaft  and door must be at the (+90°) full open position. The following step are used to install the Sr. Swing (REG) push arm. Install the header and door brac...
The Senior Swing "control box" is not handed. All Senior Swing motor "gearboxes" are handed, both the 2800 Series concealed and 9500 Series surface mounted operators. The 2800 Series "concealed a...
Senior Swing 9540 Regular, push side arm, part number is: 9540-3077, specify hand and finish. Senior Swing 9550 Regular, push side arm, part number is: 9550-3077, specify hand and finish. Senio...
The part number for the threaded rod "only" on the Senior Swing regular arm is 9540-82, 9550-82, or 9560-82 or -82L for the long rod option.The part number for the threaded rod, turn buckles, and m...
The 9542, 9553, 9563 surface mounted Senior Swing with a regular arm, mounted on the push side of the door, can handle a reveal from 1 1/8" up to 10". The 9542, 9553, 9563 surface mounted Senior S...
Surface Mounting - A 9542 DD (double door) header and a 9540-18 mounting plate can be used on the active leaf. A manual closer with a PA (parallel arm) can the be installed on the inactive leaf.  B...
track arm, std arm