Where are frame installation instructions

RELATED FAQS

Question
Answer
Yes, a filler plate can be used to cover an EPT prep as long as it is made from the same material as the frame. This information can also be found in NFPA 80 under Chapter 5 for Field Modifications.
Industry standards for hollow metal frames installation tolerances have been developed by both the SDI (Steel Door Institute) and HMMA (Hollow Metal Manufacturers). Both standards are based on the ...
Click HERE for the  instruction and template for 237L device.
The link to the specific sheet can be found by clicking here:  http://us.allegion.com/content/dam/allegion-us-2/web-documents-2/InstallInstructions/Von_Duprin_PS914_Power_Supply_Installation_I...
It is always recommended to point installers to the industry installation manuals which are very comprehensive and are ANSI documentsClick here to get the updated link to the Steelcraft Shop M...
The rough opening dimensions are the same for either Welded (SUA) or Knock Down (KD) frames For F, FN, FE, DE, MU three sided frames and four sided borrowed light frames: New masonry W...
 For DW, K three sided frames and four sided borrowed light frames: Three sided frame = door opening width (order size) plus 1 1/2" minimum to 2" maximum and the door opening hei...