where are steeelcraft locations

RELATED FAQS

Question
Answer
EPT installation guidelines are as follows: Recommended location is 6" below top hinge per template Steelcraft will locate the power transfer prep at the Von Duprin recommended template locati...
The wires run through the device out to the EPT. See step 7 on page 5 of E996L instructions.
From head to centerline of each hinge (4 1/2" or 5") is 9 3/4", 39 3/64", 68 11/32" & 97 41/64".
The hinge spacing on a 9'0" frame opening height is 29 19/64".
From Head to top of each 4 1/2" hinge is 7 1/2", 36 51/64", 66 3/32" & 95 25/64". From Head to top of each 5" hinge is 7 1/4", 36 35/64", 65 27/32" & 95 9/64".