wire routing through device

RELATED FAQS

Question
Answer
The wires run through the device out to the EPT. See step 7 on page 5 of E996L instructions.
Wiring and Riser diagrams can be accessed at: Common wiring diagrams can be accessed at:  us.allegion.com Go to "Document Library" > then choose Document type of "Wiring ...
EPT installation guidelines are as follows: Recommended location is 6" below top hinge per template Steelcraft will locate the power transfer prep at the Von Duprin recommended template locati...
The following common wiring diagrams are available:One Single Door with Panic BarElectric Latch Retraction, with Auto OperatorDelayed egress - Fire Rated ApplicationAuto Operator and actuatorElectr...
Electronic Protocols:Access Control Door with electric trimAccess Control with electric strike Access control with electric strike and LCN 4600 automatic operatorAccess Control with remote Loc...
The 4630/4640 operator activation inputs are: Normal Activation Inputs (2 parallel) - terminals 16 & 17 or 18 & 19. Sequential Input - terminals 8 & 19. Alternate Action Input - terminals 15 &...
Chexit devices shipped prior to 8-24-2015 with solenoid driven: A normally closed card reader contact, key pad contact or any other control contact connects to the Green an...
Chexit devices shipped after 8-24-2015 with motor driven:Use the Alarm Relay Contacts on Field Wiring Cable, blue and brown wires of the Chexit device.Connect the blue wire to +24VDC (red wire on F...
Chexit devices shipped prior to 8-24-2015 with solenoid driven:Use the external alarm contact, blue and brown wire on Chexit device.Connect the blue wire to the red wire and connect the brown wire ...